Kirsten

I designed, built and commissioned a great experiment. Right before i was about to get results, my boss took away my status as project leader and gave it to a guy who was less experienced than me because people liked him, aka, he was one of the guys. He, together with my boss, made stupid, seemingly minor changes to the setup which they claimed fixed the mistakes I made. They were trying to change it enough to claim ownership of the results. Then, instead of getting the results I’d been working towards, they spent a whole year specifically diagnosing why the changes that they had made were stupid (for reasons which I had predicted) and returning to the way I had originally built it. Now, the clock is running out and if we do get the results in time, I’m sure they’ll want the credit.